This article examines the calculation and treatment of uncertainty in risk-
based allowable outage times (AOTs) for operational control at nuclear powe
r plants, where an AOT is defined as the time that a component or system is
permitted to be out of service. The US Nuclear Regulatory Commission NRC h
as explored the possibility of using a nuclear power plant's probabilistic
risk assessment results to determine component or system AOTs. The analysis
and results from previous work prepared for the NRC on determining risk-ba
sed AOTs are presented. As part of the discussion, the article examines the
inherent uncertainty in calculating risk-based AOTs and presents the diffi
culties in calculating these risk-based AOTs. It is noted that care should
be taken when dealing with uncertainty analysis results where a time-interv
al is the outcome of the analysis. In addition, potential improvements in t
he mechanism of calculating risk-based AOTs are suggested. (C) 1999 Elsevie
r Science Ltd. All rights reserved.