After the clinker production had been shut down in 1984 the ZEAG Lauffen ce
ment works was restructured in stages to form a modern clinker grinding wor
ks. At the end of 1995 ABB was awarded the contract to install a process sy
stem (Advant OCS), an automatic laboratory (AutoLab) and an industry-specif
ic management information system (CIMS). After a production period of almos
t two years it has been established that the objectives of increasing produ
ctivity, raising quality and,educing maintenance costs have been, fulfilled
.