A Shewhart R control chart is developed to monitor the process variance for
large production runs. It is not appropriate to monitor the process varian
ce using the Shewhart R control chart for short production runs. In this pa
per, we propose the design of the R central chart for short production runs
. For various combinations of the number of samples and the size of each sa
mple, control coefficients of the R control chart are calculated by numeric
al methods. Using these results, the R control chart for short production r
uns is developed to monitor the process variance correctly. Finally, the de
sign procedure of the R control chart for short production runs and the res
ults of misusing the Shewhart R control chart are illustrated by an example
.