The Power Control Division of GNB Technologies commissioned on the 13th May
1996 a new facility housing a 5 MW battery energy storage system (BESS) at
GNB's Lead Recycling Center in Vernon, California. The Vernon BESS is the
largest known installation of its hind in the would owned and operated by a
n industrial manufacturer to support critical manufacturing process equipme
nt, including the operation of emission control systems associated with han
dling lead dust. GNB's primary concern is to assure the continual operation
of these systems during a power outage.