The first field installation of a multiphase surface ejector was successful
ly accomplished in the Villafortuna oilfield (Italy) in 1996. The ejector i
ncreased the oil production rate by 30% and demonstrated the viability of t
he system as a reliable low cost-small size boosting system that had minima
l impact on existing facilities, and is suitable for applications in existi
ng fields or for new development both onshore and offshore.
The article describes the main steps of the R&D project, developed in colla
boration with the University of Ancona, as well as the testing process in w
hich different ejector geometries were extensively tested with crude oil an
d gas in the Agip's multiphase loop of Trecate.
The article describes the installation in the Villafortuna field as well as
other studies under development.