The eastern end of the Jubilee Line Extension comes out of the ground at Ca
nning Town and runs for 3.5 km at ground level to Stratford via West Ham. T
he extremely confined route meant that the engineering challenges on the at
-grade section were no less than those on the tunnelled sections. The const
ruction meant closing the North London Line for a year while it was rebuilt
alongside the extension and literally sliding a 2500 t elevated platform i
n between two live railways at Canning Town. This paper discusses the compl
ex advance works required throughout the route and then focuses on the desi
gn and construction of Canning Town station.