The paper deals with the problem of improving the machine utilization of a
flexible manufacturing cell. Limited tool magazine space of the machines tu
rns out to be a relevant bottleneck, A hierarchic approach for this problem
is proposed. At the upper level, sets of parts that can be concurrently pr
ocessed (batches) are determined. At the lower levels, batches are sequence
d,linked, and scheduled. Methods taken from the literature are used for the
solution of the latter subproblems, and an original mixed integer programm
ing model is formulated to determine batches. The proposed methods are disc
ussed on the basis of computational experience carried out on real instance
s. (C) 1999 Elsevier Science Ltd. All rights reserved.