Sge. Li et al., Bond performance of rapid-setting repair materials subjected to deicing salt and freezing-thawing cycles, ACI MATER J, 96(6), 1999, pp. 692-697
Bond deterioration due to deicer salt and freezing-thawing cycles is a majo
r cause of repair failures to highway pavements and bridge decks. This rese
arch used a pulloff test to examine how combined deicer salt application an
d freezing-thawing cycles affected the bond between portland cement concret
e and two rapid-setting repair materials. Variables included curing conditi
ons, age, and combined freezing-thawing cycles with deicer application. Sur
face deterioration of each repair material was monitored.