The problem of component allocation and sequencing PCB assembly jobs for tw
o series-connected SMD placement machines is addressed. With the allocation
of components, a balancing of the workload per PCB for the two machines sh
ould be achieved. Furthermore, when switching from one type of PCB to anoth
er, setup times must be considered. Two heuristic procedures are developed
and tested in extensive numeric analyses of a number of realistic case mode
ls. The problem examined and the database used represent a concrete case of
an industrial application in which very diversified small jobs are to be p
rocessed.