Strengthening the high-rise portion of the San Mateo Bridge required work o
n nearly every aspect, from the superstructure to the substructure to the p
iers and foundations. The retrofit called for upgrading the steel box girde
r hinges, drilling new piles, and encasing piers in either concrete collars
or steel jackets.