K. Artoos et al., Design, manufacturing status, first results of the LHC main dipole final prototypes and steps towards series manufacture, IEEE APPL S, 10(1), 2000, pp. 98-102
This paper reports about the program of six LHC superconducting main dipole
final prototypes and the steps towards series manufacture, The above progr
am, launched in summer 1998, relies on collared coils manufactured by indus
try and cold masses assembled at the CERN Magnet Assembly Facility. Followi
ng design, stability and robustness studies, the magnet design for series m
anufacture features a "6-block" coil and austenitic steel collars. A genera
l description of the magnet with its main components is given and the main
working parameters and the most important manufacturing features are presen
ted. Results of mechanical and magnetic measurements are given as well as t
he performances of the first prototype. A comparison with results from the
previous generation of dipole magnet models and prototypes is also made. Fi
nally an outlook towards series manufacture is given.