This paper addresses the production control problems created in the schedul
ing of a flexible manufacturing cell consisting of groups of identical mach
ines. An actual manufacturing system, drawn from Sikorsky Aircraft Corporat
ion, was used as a prototype for modeling the cell to study its optimal beh
avior. The model, stated in the form of optimal production flow control com
bines classical machine-part scheduling and scheduling of part fixtures. Su
ch an extension induces three problem formulations comprising practical pro
duction issues important for many modern plants other than Sikorsky. These
formulations are related to three production cases covering different degre
es of fixture availability. With the aid of the maximum principle, a numeri
cal scheduling method is constructed for all three problem formulations, an
d case studies are presented.