In this paper, the effects of transformer replacement on the electric are f
urnace power system of an iron and steel plant have been investigated. The
new operating strategy has been determined according to stable are and maxi
mum productivity requirements. Based on these new operating conditions, the
sufficiency of the existing flicker compensation system in terms of the lo
ad balancing, power-factor correction, and flicker have been examined. All
investigations made in this work are supported by real-time measurements.