Project procurement system selection model

Citation
T. Alhazmi et R. Mccaffer, Project procurement system selection model, J CONS ENG, 126(3), 2000, pp. 176-184
Citations number
14
Categorie Soggetti
Civil Engineering
Journal title
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE
ISSN journal
07339364 → ACNP
Volume
126
Issue
3
Year of publication
2000
Pages
176 - 184
Database
ISI
SICI code
0733-9364(200005/06)126:3<176:PPSSM>2.0.ZU;2-A
Abstract
In the last two decades, there have been significant changes in the technic al and economic conditions prevailing in the construction industry. To over come the shortcomings of the traditional procurement methods, the construct ion industry has developed a large number of different procurement systems. A systematic approach for selection of the most appropriate system is now needed. This paper presents the development of the project procurement syst em selection model (PPSSM), which integrates the techniques of the analytic hierarchy process and Parker's judging alternative technique of value engi neering into a multicriteria multiscreening system. A survey was conducted in Saudi Arabia with the aim of testing the PPSSM for effectiveness and eff iciency and assisting the governmental agencies to select the most appropri ate procurement system for implementation of their projects. For this purpo se, a questionnaire was developed. On the basis of the synthesis process of the PPSSM, Saudi public clients selected design and build as the most appr opriate procurement system for their projects, with an overall priority of 0.496. The outcome of the study demonstrates the effectiveness of PPSSM in helping the client in the construction industry to choose the procurement s ystem that fulfills the needs of the client and the project requirements.