This paper presents a new methodology to evaluate loss of load indices, wit
h particular emphasis on LOLC (loss of load cost) assessment, for composite
generation and transmission systems considering time varying loads for dif
ferent areas or buses. The proposed approach, named pseudo-chronological si
mulation, retains the computational efficiency of non-sequential Monte Carl
o simulation and the ability to model chronological load curves in sequenti
al simulation. It considers the actual blocks of unsupplied energy per cons
umer class, per bus, and the respective duration, to accurately characteriz
e the interruption process. Case studies on the IEEE-MRTS (Modified Reliabi
lity Test System) and the BSS (Brazilian South-Southeastern System) are pre
sented and discussed.