Hilda Lake is a Steam Assisted Gravity Drainage (SAGD) project. The Mahkese
s project is an expansion of the Imperial Oil Resources Limited commercial
Cold Lake project based on Cyclic Stream Stimulation (CSS). Both projects a
re based implemented in the same Clearwater reservoir and will be adjacent
to each other at the lease boundary. The projected performance of CSS at Ma
hkeses as given in the Alberta Energy Board Application for Approval is com
pared with the predicted and actual performance of SAGD at Hilda Lake. Para
meters to be compared include: production rates, steam requirements, electr
ical power requirements, projected recovery factors, and produced water qua
lity.