While the growing environmental concerns and other economic and regula
tory factors make it very difficult for utilities to build new transmi
ssion lines, the need for new transmission facilities is compounded by
the trend to deregulate the electric power industry. The need to buil
d new lines may be lessened if existing transmission lines can be more
effectively utilized. The objective of this paper is to provide a com
parison of various alternatives that can enhance the utilization of tr
ansmission lines. The major constraints that limit real power transfer
are identified and various ways to overcome one or more of these cons
traints constitute the various alternatives to improve the power and e
nergy transfer capabilities of transmission lines. An evaluation frame
work has been developed to provide a quantitative comparison of variou
s alternatives. The results demonstrate that utilization of transmissi
on lines can be significantly enhanced by several alternatives. The be
st alternative in each performance category and the best alternative f
rom the viewpoint of overall performance are presented. (C) 1997 Elsev
ier Science S.A.