The Hamburger Stadtentwasserung (HSE) is planning to take on a further appr
oximately 250,000 PE in addition to the 1.85 m PE already served by its com
bined wastewater treatment plants at Kohlbrandhoft/Dradenau. To cope with t
he increased load, a concept for the extension of the plants had to be deve
loped. Various concepts were compared and evaluated using a dynamic compute
r simulation.
The very wide-ranging simulation study showed that the required effluent st
andards can still be achieved after the volume of the sludge liquor storage
capacity has been increased. As many concepts had been assessed in detail,
the final solution chosen was considerably less expensive than if the wast
ewater treatment plants had been extended in a traditional manner.