This paper addresses a marked variation of the classical trim-loss problem.
This problem has been dealt with a rule-based approach due to its inherent
complexity in the case under consideration. A rule-based model was evolved
as the basis for the expert system development. The paper emphasises on th
e practical application of a rule-based model for inventory issue procedure
in a construction company. Due to the peculiar nature of the problem, issu
ing procedures for steel pipes are quite different from the normal inventor
y issue practices. Inventory Management procedures which are guided by hist
oric practices, rules of thumb and mathematical models were found to be uns
uitable for the case under study and hence motivates the use of a "rule-bas
ed system" that has evolved from the "expert" knowledge of inventory person
nel. The paper provides some of the implementation modules and highlights t
he benefits of the rule-based system for the construction company under stu
dy. (C) 2000 Elsevier Science Ltd. All rights reserved.