The application of gain-scheduled control to a pilot-scale solar power plan
t is described. A field of parabolic collectors focus the solar radiation o
nto a tube where oil is pumped through in order to collect the solar power.
The control problem is to keep the temperature of the oil leaving the fiel
d at its desired value by manipulating the oil pump flow rate. It is shown
that gain-scheduling can effectively handle the plant nonlinearities, using
high-order local linear ARX models that form the basis for the design of l
ocal linear controllers using pole placement. (C) 2000 Elsevier Science Ltd
. All rights reserved.