Multi-period probabilistic production cost model including dispatch constraints

Citation
J. Perez-ruis et Aj. Conejo, Multi-period probabilistic production cost model including dispatch constraints, IEEE POW SY, 15(2), 2000, pp. 502-507
Citations number
11
Categorie Soggetti
Eletrical & Eletronics Engineeing
Journal title
IEEE TRANSACTIONS ON POWER SYSTEMS
ISSN journal
08858950 → ACNP
Volume
15
Issue
2
Year of publication
2000
Pages
502 - 507
Database
ISI
SICI code
0885-8950(200005)15:2<502:MPPCMI>2.0.ZU;2-Z
Abstract
This paper presents a multi-period probabilistic production cost model. Dis patch intra-period and inter-period constraints are considered through the use of a facet LP formulation. An efficient solution procedure based on the Dantzig-Wolfe decomposition technique is developed. The work reported in t his paper extends previous work in two respects: (i) inter-period constrain ts are rigurously treated, and (ii) a systematic general solution procedure is developed. Results for a large-scale case study are presented.