Remodeling of the JT-60 discharge control system (DCS) is initiated to mini
mize the cost and time for hardware maintenance and software development. T
hree principles have been adopted for remodeling. (1) The functions of the
DCS must remain intact. (2) The shutdown period must be minimized to maximi
ze JT-60 experiment time. To realize the new DCS, (3) a combination of the
host workstation (WS) and target Versa Module Europe (VME)-bus system with
real time OS was chosen as the fundamental structure. The prototype DCS was
designed and tested to evaluate the performance of the converted discharge
sequential control software modules and the message communication program.
The new configuration of the DCS and procedure of smooth remodeling withou
t shutdown is described in detail. (C) 2000 Elsevier Science S.A. All right
s reserved.