Status of the AMS project at IOP Bhubaneswar

Citation
Gvr. Prasad et al., Status of the AMS project at IOP Bhubaneswar, NUCL INST B, 172, 2000, pp. 66-69
Citations number
2
Categorie Soggetti
Spectroscopy /Instrumentation/Analytical Sciences","Instrumentation & Measurement
Journal title
NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION B-BEAM INTERACTIONS WITH MATERIALS AND ATOMS
ISSN journal
0168583X → ACNP
Volume
172
Year of publication
2000
Pages
66 - 69
Database
ISI
SICI code
0168-583X(200010)172:<66:SOTAPA>2.0.ZU;2-6
Abstract
The 3 MV tandem Pelletron accelerator facility at the Ion Beam Laboratory o f the Institute of Physics (IOP), Bhubaneswar is being augmented by the ins tallation of a fast bouncer system for routine C-14 measurements. The old i njector involving a single cathode SNICS source and a 45 degrees bending ma gnet has been replaced by a new system consisting of a 40 cathode MC-SNICS source and a 90 degrees analyzing bending magnet. The system is being teste d for transmission. The status of the facility with test results is present ed. (C) 2000 Elsevier Science B.V. All rights reserved.