Reduced activation ferritic steel F-82H is a primary candidate structural m
aterial of DEMO fusion reactors. In fabrication technology, development of
the DEMO blanket in JAERI, a hot isostatic pressing (HIP) bonding method, e
specially for the first wall structure with built-in cooling tubes has been
proposed. A HIP-bonded F-82H first wall panel was successfully fabricated
with selected manufacturing parameters. A high heat flux test of the HIP-bo
nded F-82H first wall panel has been performed to examine the thermo-mechan
ical performance of the panel including the integrity of the HIP-bonded int
erfaces and the fatigue behavior. A maximum heat flux of 2.7 MW/m(2) was ap
plied to accelerate the fatigue test up to 5000 cycles in test blanket inse
rted ITER. The maximum temperature of the panel was similar to 450 degreesC
under this heat flux. Through this test campaign, no damage such as cracks
was observed on the surface of the panel, and no degradation in heat remov
al performance was observed either from the temperature responses. The ther
mal fatigue lifetime of the panel was found to be longer than the fatigue d
ata obtained by mechanical testing. (C) 2000 Elsevier Science B.V. All righ
ts reserved.