A case study on preventive maintenance (PM) of a multi-equipment system is
presented in this paper. Each equipment of the system consists of many comp
onents/subsystems connected in series. Because of the series structure, opp
ortunistic maintenance (OM) policies are more effective for the components
of the equipment. A new OM policy based on the classification of opportunit
ies has been proposed. Various OM policies have been evaluated using simula
tion modeling, and the new policy has been found to be more effective than
the existing OM policies. The impact of this policy on the overall system h
as also been simulated. Copyright (C) 2000 John Wiley & Sons, Ltd.