Opportunistic maintenance of multi-equipment system: A case study

Citation
An. Rao et B. Bhadury, Opportunistic maintenance of multi-equipment system: A case study, QUAL REL EN, 16(6), 2000, pp. 487-500
Citations number
12
Categorie Soggetti
Engineering Management /General
Journal title
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL
ISSN journal
07488017 → ACNP
Volume
16
Issue
6
Year of publication
2000
Pages
487 - 500
Database
ISI
SICI code
0748-8017(200011/12)16:6<487:OMOMSA>2.0.ZU;2-2
Abstract
A case study on preventive maintenance (PM) of a multi-equipment system is presented in this paper. Each equipment of the system consists of many comp onents/subsystems connected in series. Because of the series structure, opp ortunistic maintenance (OM) policies are more effective for the components of the equipment. A new OM policy based on the classification of opportunit ies has been proposed. Various OM policies have been evaluated using simula tion modeling, and the new policy has been found to be more effective than the existing OM policies. The impact of this policy on the overall system h as also been simulated. Copyright (C) 2000 John Wiley & Sons, Ltd.