A new pumping-probing scheme for the optically pumped cesium beam frequency standard

Citation
Jb. Chen et al., A new pumping-probing scheme for the optically pumped cesium beam frequency standard, CHIN PHYS L, 18(1), 2001, pp. 16-17
Citations number
11
Categorie Soggetti
Physics
Journal title
CHINESE PHYSICS LETTERS
ISSN journal
0256307X → ACNP
Volume
18
Issue
1
Year of publication
2001
Pages
16 - 17
Database
ISI
SICI code
0256-307X(2001)18:1<16:ANPSFT>2.0.ZU;2-4
Abstract
A new pumping-probing scheme for the optically pumped cesium beam frequency standard has been experimentally tested in our laboratory The stability of the optically pumped cesium beam frequency standard was measured by compar ing its 10 MHz output with an HP5071A commercial cesium atomic clock. The r esult shows that the frequency stability for the 1s and 30000s sample times are 1.2 x 10(-11) and 3.7 x 10(-13), respectively. It was proved that the new pumping scheme works well.