Preliminary support design for Ankara subway extension tunnel

Citation
A. Ozsan et C. Karpuz, Preliminary support design for Ankara subway extension tunnel, ENG GEOL, 59(1-2), 2001, pp. 161-172
Citations number
15
Categorie Soggetti
Geological Petroleum & Minig Engineering
Journal title
ENGINEERING GEOLOGY
ISSN journal
00137952 → ACNP
Volume
59
Issue
1-2
Year of publication
2001
Pages
161 - 172
Database
ISI
SICI code
0013-7952(200101)59:1-2<161:PSDFAS>2.0.ZU;2-S
Abstract
This paper presents the results of preliminary support design of the subway tunnel for Ankara subway project in accordance with some empirical and num erical methods, using the phase 2D finite element method (FEM). The 5 m dia meter subway tunnel will advance through slightly to moderately weathered d acite and weak zones. Rock masses were characterized in terms of rock mass rating (RMR), geological strength index (GSI) and Q System. Core samples we re tested in the rock mechanics laboratory to determine uniaxial compressiv e strength, deformability parameters, unit weight, tensile strength and tri axial compressive strength properties. Finally, rock mass strengths were de termined by empirical and numerical methods. Required support system was su ggested. (C) 2001 Elsevier Science B.V. All rights reserved.