A three-strand tundish belonging to a billet easter was water modelled and
plant trials were performed to compare the performance of a pouring box and
a turbulence inhibitor in terms of melt flow parameters and steel cleanlin
ess.
A tailor made turbulence inhibitor for this tundish is useful to accomplish
with flow control of fluid turbulence and even melt redirection to all str
ands. The turbulence inhibitor helps to decrease nitrogen pickup during lad
le changes and to float out inclusions towards the covering slag. As a cons
equence, rod operations to take of alumina deposits from nozzle walls are c
onsiderably decreased using a turbulence inhibitor.