The resource constrained project scheduling problem with multiple crashable modes: An exact solution method

Citation
Ss. Erenguc et al., The resource constrained project scheduling problem with multiple crashable modes: An exact solution method, NAV RES LOG, 48(2), 2001, pp. 107-127
Citations number
21
Categorie Soggetti
Civil Engineering
Journal title
NAVAL RESEARCH LOGISTICS
ISSN journal
0894069X → ACNP
Volume
48
Issue
2
Year of publication
2001
Pages
107 - 127
Database
ISI
SICI code
0894-069X(200103)48:2<107:TRCPSP>2.0.ZU;2-H
Abstract
We introduce a formulation and an exact solution method for a nonpreemptive resource constrained project scheduling problem in which the duration/cost of an activity is determined by the mode selection and the duration reduct ion (crashing) within the mode. This problem is a natural combination of th e time/cost tradeoff problem and the resource constrained project schedulin g problem. It involves the determination, for each activity, of its resourc e requirements, the extent of crashing, and its start time so that the tota l project cost is minimized. We present a branch and bound procedure and re port computational results with a set of 160 problems. Computational result s demonstrate the effectiveness of our procedure. (C) 2001 John Wiley & Son s, Inc.