Early, accurate determination of original gas in place (OGIP) is highly des
irable for planning the future of a gas field. This paper presents a case h
istory of an offshore gas field, using a recently developed pressure-rate-t
ime analysis technique to illustrate the effectiveness of the method. In ad
dition, this paper demonstrates the great benefit of permanently installed
pressure gauges in obtaining consistent pressure and flow-rate data for the
effective use of the technique for subsea completed wells.