C. Low et Th. Wu, Mathematical modelling and heuristic approaches to operation scheduling problems in an FMS environment, INT J PROD, 39(4), 2001, pp. 689-708
This paper addresses an operation scheduling problem with the objective of
minimizing total tardiness in a flexible manufacturing system with setup ti
me consideration. The addressed problem is first described as a 0-1 integer
programming model, and is then solved optimally. Subsequently, a heuristic
is proposed to solve the problem in an acceptable running time. The heuris
tic begins on a schedule generator called ESCH to obtain an initial solutio
n; then two procedures are designed to improve the solution quality. One is
a sequence-improving procedure (SIP) for determining a better performance
schedule from a certain routing plan; the other is a routing-exchanging pro
cedure (REP) for selecting a good routing plan. Both procedures are achieve
d by simulated annealing. Computational experiments show that the proposed
simulated annealing based heuristic performs well with respect to solution
accuracy and efficiency.