The large helical device (LHD) is the largest heliotron type superconductin
g device. Its operation was started on 31 March 1998. Three experimental ca
mpaigns have been completed until the end of 1999. Wall conditioning mainly
by cleaning discharges using ECRF or glow discharges worked well even with
out high temperature baking, The plasma production with ECRH and auxiliary
heating with NBI and/or ICRF in the LHD configuration equipped with open he
lical divertor were well performed. The divertor material was SS316L in the
first and second campaigns, and was replaced by the graphite in the third
campaign. The influences of the different divertor materials were investiga
ted. Our understanding of the edge and the divertor plasma has progressed.
Long-pulse discharges 80 and 68 s heated by NBI (0.5 MW) or ICRF (0.9 MW) h
ave been achieved, respectively. No severe limitation of the duration has a
ppeared. (C) 2001 Elsevier Science B.V. All rights reserved.