During unit wise conditioning of unit # 8, the vacuum started deteriorating
inside the tube after a spark. The RGA leading was taken and it was found
out that residual gas inside tube was sulphur hexafluoride. A leak was dete
cted in second tube of unit number eight in between electrode 6 to 8. Leak
was sealed with the sealant. Again leak check was done and no leak was foun
d. The tank was closed and conditioning was started again. During the same
unit number eight conditioning, leak developed again followed by a spark. S
o the damaged tube was replaced with a new accelerator tube. During the ins
tallation time the alignment of the machine was taken care. Again leak chec
king was done and the tube was baked properly. The tank was closed again an
d this particular unit was conditioned for about four days. The maximum vol
tage it has attained was 1.1 MV.