Commissioning status of Indus-1 SR facility

Citation
G. Singh et al., Commissioning status of Indus-1 SR facility, I J PA PHYS, 39(1-2), 2001, pp. 96-103
Citations number
5
Categorie Soggetti
Physics
Journal title
INDIAN JOURNAL OF PURE & APPLIED PHYSICS
ISSN journal
00195596 → ACNP
Volume
39
Issue
1-2
Year of publication
2001
Pages
96 - 103
Database
ISI
SICI code
0019-5596(200101/02)39:1-2<96:CSOISF>2.0.ZU;2-P
Abstract
The Indus-1 synchrotron radiation facility consists of a 450 MeV storage ri ng for the production of VUV radiation and an injector system, which has a 20 MeV microtron and a synchrotron. This facility has been successfully com missioned in 1999. In the synchrotron, a current of 11 mA has been achieved at 450 MeV. Two out of three bunches from the synchrotron have been succes sfully extracted and injected into Indus-1 storage ring. Maximum current of 161 mA was accumulated in the Indus-1 storage ring. Beam dynamics studies carried out on these machines during the commissioning ale described in thi s paper.