The Indus-1 synchrotron radiation facility consists of a 450 MeV storage ri
ng for the production of VUV radiation and an injector system, which has a
20 MeV microtron and a synchrotron. This facility has been successfully com
missioned in 1999. In the synchrotron, a current of 11 mA has been achieved
at 450 MeV. Two out of three bunches from the synchrotron have been succes
sfully extracted and injected into Indus-1 storage ring. Maximum current of
161 mA was accumulated in the Indus-1 storage ring. Beam dynamics studies
carried out on these machines during the commissioning ale described in thi
s paper.