Design and performance of the 110 GHz electron cyclotron heating installation on the DIII-D tokamak

Citation
D. Ponce et al., Design and performance of the 110 GHz electron cyclotron heating installation on the DIII-D tokamak, FUSION TECH, 39(2), 2001, pp. 1121-1125
Citations number
6
Categorie Soggetti
Nuclear Emgineering
Journal title
FUSION TECHNOLOGY
ISSN journal
07481896 → ACNP
Volume
39
Issue
2
Year of publication
2001
Part
2
Pages
1121 - 1125
Database
ISI
SICI code
0748-1896(200103)39:2<1121:DAPOT1>2.0.ZU;2-E
Abstract
The 110 GHz Electron Cyclotron Heating System on the DIII-D tokamak is bein g upgraded by the installation of additional gyrotrons, versatile launchers , and an improved control system. A total of six gyrotrons in the 1 MW clas s will be available for experiments during the 2001 experimental campaign. The installation will be described and the operational experience to date w ill be presented.