D. Ponce et al., Design and performance of the 110 GHz electron cyclotron heating installation on the DIII-D tokamak, FUSION TECH, 39(2), 2001, pp. 1121-1125
The 110 GHz Electron Cyclotron Heating System on the DIII-D tokamak is bein
g upgraded by the installation of additional gyrotrons, versatile launchers
, and an improved control system. A total of six gyrotrons in the 1 MW clas
s will be available for experiments during the 2001 experimental campaign.
The installation will be described and the operational experience to date w
ill be presented.