Status of the LHC inner triplet quadrupole program at Fermilab

Citation
N. Andreev et al., Status of the LHC inner triplet quadrupole program at Fermilab, IEEE APPL S, 11(1), 2001, pp. 1558-1561
Citations number
5
Categorie Soggetti
Apllied Physucs/Condensed Matter/Materiales Science
Journal title
IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY
ISSN journal
10518223 → ACNP
Volume
11
Issue
1
Year of publication
2001
Part
2
Pages
1558 - 1561
Database
ISI
SICI code
1051-8223(200103)11:1<1558:SOTLIT>2.0.ZU;2-7
Abstract
Fermilab, in collaboration with LBNL and BNL, is developing a quadrupole fo r installation in the interaction region inner triplets of the LHC. This ma gnet is required to have an operating gradient of 215 T/m across a 70 mm co il bore, and operates in superfluid helium at 1.9 K. A 2 m magnet program a ddressing mechanical, magnetic, quench protection, and thermal issues assoc iated with the design was completed earlier this year, and production of th e first full length, cryostatted prototype magnet is underway. This paper s ummarizes the conclusions of the 2 m program, and the design and status of the first full-length prototype magnet.