During international investigations of the safety status of the Russian PWR
plants (WWER), the protection against the effects of high-energy line brea
ks was considered. Especially, in the field of protection against local pip
e break effects, the WWER plants showed some relevant shortcomings. The mos
t critical area of the plants is the main steam and feed water system compa
rtment located between the reactor containment and the turbine hall. The mo
dernization programs of several nuclear power plants (NPPs) with WWER bring
efforts to limit the effects due to postulated high-energy line breaks. Wi
thin such programs, Siemens has carried out detailed investigations on the
WWER-440/ 213 NPP Mochovce Units 1 and 2, and on the WWER-1000/320 NPP Kozl
oduy Units 5 and 6. The methodology of the investigations is. presented and
some of the most important measures are shown in this paper. It can be con
cluded that, due to the performed analyses and the implemented protection m
easures, main steam line and main Feedwater line breaks at the postulated b
reak locations will not lead to consequential failures beyond the defined d
esign basis for accident mitigation. (C) 2001 Elsevier Science B.V., All ri
ghts reserved.