An estimate has been made of the feasibility of a metallurgical purificatio
n process, the NEDO (New Energy and Industrial Technology Development Organ
ization) melt-purification process, for manufacturing solar-grade silicon f
rom metallurgical-grade silicon. Equipment has been developed to pilot manu
facturing plant scale. The system comprises an electron-beam furnace for ph
osphorus removal and a plasma furnace for boron removal. Each furnace has a
mold for directional solidification to remove metallic impurities. The con
centration of each impurity in the silicon ingot purified through the whole
process satisfied the solar-grade level, The Solar-grade silicon produced
showed p-type polarity and resistivity within the range 0.5-1.5 Omega cm. C
opyright (C) 2001 John Wiley & Sons, Ltd.