S. Winkler et al., A new approach towards modelling of the carbon degradation cycle at two-stage activated sludge plants, WATER SCI T, 43(7), 2001, pp. 19-27
A pilot plant has been operated in order to investigate the performance and
operating characteristics of the plant concept developed for the extension
of the main Vienna STP. Due to the different operational modes included in
the plant concept, modelling of the carbon degradation becomes of crucial
importance. A new activated sludge model is introduced which combines parts
of the carbon degradation model concepts as they have been released in the
ASM1-model and the ASM3-model, respectively. A method is presented which u
tilises results from mass balance calculations and sludge stabilisation exp
eriments to reduce the uncertainty in the determination of the values of th
e simulation model parameters.