The integration of complete replanning and rule-based repairing for optimal operation of utility plants

Authors
Citation
Hs. Yi et Ch. Han, The integration of complete replanning and rule-based repairing for optimal operation of utility plants, KOR J CHEM, 18(4), 2001, pp. 442-450
Citations number
19
Categorie Soggetti
Chemical Engineering
Journal title
KOREAN JOURNAL OF CHEMICAL ENGINEERING
ISSN journal
02561115 → ACNP
Volume
18
Issue
4
Year of publication
2001
Pages
442 - 450
Database
ISI
SICI code
0256-1115(200107)18:4<442:TIOCRA>2.0.ZU;2-O
Abstract
The integration methodology of complete replanning and plan repairing is pr oposed to handle the prediction errors for energy demands during multiperio d operational planning. Complete replanning is implemented periodically and plan repairing is triggered during the execution interval. The plan repair ing is constructed by a rule-based system because of real-time limitations. The efficiency index of a utility pump is introduced to determine startup/ shutdown of equipment without integer programming in plan repairing. Case s tudies show that the proposed method is more profitable than the convention al replanning method. The total operating costs are, reduced by 0.3-9.0% co mpared with the conventional replanning method.