Jg. Kang et al., Parallel disassembly sequencing with sequence-dependent operation times, CIRP ANN-M, 50(1), 2001, pp. 343-346
Citations number
11
Categorie Soggetti
Mechanical Engineering
Journal title
CIRP ANNALS-MANUFACTURING TECHNOLOGY
Volume
50
Issue
1
Year of publication
2001
Pages
343 - 346
Database
ISI
SICI code
Abstract
This paper focuses on the disassembly sequencing, which is the problem of d
etermining the disassembly level and the corresponding disassembly sequence
for a product at its end-of-life with the objective of maximizing the over
all profit. Parallel disassembly and sequence-dependent operation times are
considered by developing an extended process graph obtained from a transfo
rmation of a conventional AND/OR graph. Then, an integer programming formul
ation is developed with precedence constraints that allows its resolution w
ith standard techniques. Finally, an optimal solution is obtained, with a r
easonable amount of computation time, for an industrial application of a su
bassembly of a copy machine.