Risk analysis in construction networks using a modified stochastic assignment model

Citation
Ql. Guo et al., Risk analysis in construction networks using a modified stochastic assignment model, CIV ENG E S, 18(3), 2001, pp. 215-241
Citations number
33
Categorie Soggetti
Civil Engineering
Journal title
CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS
ISSN journal
10286608 → ACNP
Volume
18
Issue
3
Year of publication
2001
Pages
215 - 241
Database
ISI
SICI code
1028-6608(2001)18:3<215:RAICNU>2.0.ZU;2-C
Abstract
A review of construction network analysis indicates that new methods are ne eded for quantifying risks in project evaluation. The paper proposes a new analytical method, the Modified Stochastic Assignment Model (MSAM), for the prediction of project duration. The proposed method is inspired by a previ ous method used solely in traffic networks, the Stochastic Assignment Model (SAM). The MSAM method applies Clark's approximation to find the longest p roject duration. Two cases arc used to demonstrate the validity and applica tion of the MSAM in construction project evaluations. The accuracy of the M SAM is assessed by comparing it with the Monte Carlo Simulation (MCS). A co mparison of the MSAM with other methods, such as PERT and PNET, has also be en presented. It is found that the new method is an analytical counterpart of the MCS and is very efficient in saving computational time whilst taking full account of the correlations between paths.