Design of a beamline for the SPring-8 long undulator source 1

Citation
M. Yabashi et al., Design of a beamline for the SPring-8 long undulator source 1, NUCL INST A, 467, 2001, pp. 678-681
Citations number
9
Categorie Soggetti
Spectroscopy /Instrumentation/Analytical Sciences","Instrumentation & Measurement
Journal title
NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT
ISSN journal
01689002 → ACNP
Volume
467
Year of publication
2001
Part
1
Pages
678 - 681
Database
ISI
SICI code
0168-9002(20010721)467:<678:DOABFT>2.0.ZU;2-#
Abstract
The first beamline for a long X-ray undulator source is under construction at SPring-8 for development of coherence-related X-ray applications. The st ructure of the beamline, with four experimental hutches, is based on those of SPring-8 standard X-ray undulator beamlines. The station equipment prepa red for the initial operation are a multi-axis precision diffractometer, a femto-second laser system and a multi-circle diffractometer mounting a 15 T super-conducting magnet. Commissioning of the beamline will start in Octob er 2000. (C) 2001 Elsevier Science B.V. All rights reserved.