Knowledge based approach for productivity adjusted construction schedule

Authors
Citation
An. Mohamed, Knowledge based approach for productivity adjusted construction schedule, EXPER SY AP, 21(2), 2001, pp. 87-97
Citations number
32
Categorie Soggetti
AI Robotics and Automatic Control
Journal title
EXPERT SYSTEMS WITH APPLICATIONS
ISSN journal
09574174 → ACNP
Volume
21
Issue
2
Year of publication
2001
Pages
87 - 97
Database
ISI
SICI code
0957-4174(200108)21:2<87:KBAFPA>2.0.ZU;2-8
Abstract
The nature of the construction industry always resists the adoption of mana gement techniques that is successful in other disciplines. Unlike the manuf acturing industry each construction project presents a unique planning prob lem to project planners and managers. The construction process is carried o ut at a new location and materials, labor and equipment are transported to a new job site. The construction is one of few processes in which the produ ct is built in an open environment subject to various weather conditions an d other environmental factors which affect labor as well as equipment produ ctivity. This paper presents a knowledge based approach for analysis of dif ferent factors that affect construction project duration and generates norm al schedules and productivity-adjusted schedules. Project mangers can be gr eatly aided by such automated system by simulating different factors that r eflect anticipated and unanticipated project conditions and perform several schedule alternatives. An analysis of alternative schedules by using the i ntegrated knowledge based system is presented. The knowledge based system i nterfaces to estimating software, spreadsheet and scheduling soft wares in order to receive data and generate schedule reports. (C) 2001 Elsevier Scie nce Ltd. All rights reserved.