Customer demand satisfaction in production systems: A due-time performanceapproach

Citation
Js. Li et Sm. Meerkov, Customer demand satisfaction in production systems: A due-time performanceapproach, IEEE ROBOT, 17(4), 2001, pp. 472-482
Citations number
27
Categorie Soggetti
AI Robotics and Automatic Control
Journal title
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION
ISSN journal
1042296X → ACNP
Volume
17
Issue
4
Year of publication
2001
Pages
472 - 482
Database
ISI
SICI code
1042-296X(200108)17:4<472:CDSIPS>2.0.ZU;2-9
Abstract
The problem of customer demand satisfaction in production systems with unre liable machines and finite finished goods buffers (FGB) is addressed. The m easure of customer demand satisfaction is characterized by the probability to ship to the customer a required number of parts during a fixed time inte rval. This measure, referred to as the due-time performance (DTP), is often used to characterize the quality of a supplier in the automotive industry supply chain. In this paper, a method for evaluating DTP in serial and asse mbly lines is developed and the problem of selecting capacity of the FGB is discussed. The results obtained are illustrated by a case study at an auto motive component plant.