The common cycle approach to the ELSP problem with insufficient capacity

Citation
Bn. Khoury et al., The common cycle approach to the ELSP problem with insufficient capacity, INT J PRO E, 73(2), 2001, pp. 189-199
Citations number
22
Categorie Soggetti
Engineering Management /General
Journal title
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
ISSN journal
09255273 → ACNP
Volume
73
Issue
2
Year of publication
2001
Pages
189 - 199
Database
ISI
SICI code
0925-5273(20010921)73:2<189:TCCATT>2.0.ZU;2-U
Abstract
A production facility is used to produce more than a single item in order t o maximize its utilization. This, however, introduces a well-known phenomen on of interference which gives rise to the class of economic lot scheduling problems. In solving this problem, researchers have always assumed that th e production capacity is high enough to meet the demand of all items that a re produced. In this paper, we relax the capacity constraint and analyze th e lot scheduling problem under insufficient capacity. We specifically study the two-product problem using the common cycle approach, and then discuss a special extension that treats any number of products. (C) 2001 Elsevier S cience B.V. All rights reserved.