Design charts for vertical drains considering construction time

Authors
Citation
Gf. Zhu et Jh. Yin, Design charts for vertical drains considering construction time, CAN GEOTECH, 38(5), 2001, pp. 1142-1148
Citations number
19
Categorie Soggetti
Civil Engineering
Journal title
CANADIAN GEOTECHNICAL JOURNAL
ISSN journal
00083674 → ACNP
Volume
38
Issue
5
Year of publication
2001
Pages
1142 - 1148
Database
ISI
SICI code
0008-3674(200110)38:5<1142:DCFVDC>2.0.ZU;2-Z
Abstract
This technical note presents design charts for use in determining the requi red drain spacing explicitly using free strain assumption. The influence of time-dependent loading is incorporated in the design charts. The design pr ocedure is also described. When the radius of vertical drain, required degr ee of consolidation, time available, and pertinent geotechnical engineering properties of a soil are given, the charts can be used to design a vertica l drain system without unnecessary trial and error processes.