S. Alameddine et al., New transformers for increasing EAF productivity and improving electrode and energy consumption, REV METALL, 98(7-8), 2001, pp. 645
In order to reduce operation costs and to increase liquid steel production
capacity, a team "Ugine-Ardoise" and "UCAR Technical Assistance" has redime
nsioned new transformers for the electric arc furnaces and has pushed the i
nstallation to its maximum limits while maintaining the existing power inpu
t voltage infrastructure. The new transformers reactance has been considera
bly increased in order to allow operation with "high power factors" (long a
rcs). This modification has been done thanks to the fast investment returns
, resulting from considerable gains in productivity, electrode consumption
and energy consumption. The installation is not yet utilized at its full po
wer, but after some additional transformations (electrode circle diameter r
eduction on furnace No.2 and modification of electrode arms and electrode h
olding grips on the two furnaces), one more heat could be realized per day.