A sequential method for preventive maintenance and replacement of a repairable single-unit system

Citation
Kk. Lai et al., A sequential method for preventive maintenance and replacement of a repairable single-unit system, J OPER RES, 52(11), 2001, pp. 1276-1283
Citations number
20
Categorie Soggetti
Management,"Engineering Mathematics
Journal title
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
ISSN journal
01605682 → ACNP
Volume
52
Issue
11
Year of publication
2001
Pages
1276 - 1283
Database
ISI
SICI code
0160-5682(200111)52:11<1276:ASMFPM>2.0.ZU;2-Q
Abstract
This paper is concerned with when to implement preventive maintenance (PM) and replacement for a repairable 'single-unit' system in use. Under the mai n assumption that a 'single-unit' system gradually deteriorates with time, a sequential method is proposed to determine an optimal PM and replacement strategy for the system based on minimising expected loss rate. According t o this method, PM epochs are determined one after the other, and consequent ly we can make use of all previous information on the operation process of the system. Also the replacement epoch depends on the effective age of the system. A numerical example shows that the sequential method can be used to solve the PM and replacement problem of a 'single-unit' system efficiently . Some properties of the loss functions W((L) over bar (n),(b) over bar (n) )and (W) over bar (r)(N) with respect to PM and replacement respectively ar e discussed in the appendix.