Wall control blasting practices at the Ekati (TM) diamond mine

Citation
J. Peterson et al., Wall control blasting practices at the Ekati (TM) diamond mine, CIM BULL, 94(1050), 2001, pp. 67-73
Citations number
13
Categorie Soggetti
Geological Petroleum & Minig Engineering
Journal title
CIM BULLETIN
ISSN journal
03170926 → ACNP
Volume
94
Issue
1050
Year of publication
2001
Pages
67 - 73
Database
ISI
SICI code
0317-0926(200105)94:1050<67:WCBPAT>2.0.ZU;2-B
Abstract
A review of blast designs and improved blasting practices at the Ekati (TM) diamond mine is presented along with the results of three blast-monitoring experiments. Blast monitoring was undertaken to investigate blast damage m echanisms in the mine's well jointed rock mass. Rock mass damage caused by production, pre-shear and wall control blasts was measured Ekati (TM) uses 270 mm holes for production blasting, and 165 mm holes loaded with a decoup led charge for pre-shearing. The production blasts are loaded with bulk emu lsion/ANFO blends. The mine plan involves using 30 m double benches, A 30 m high pre-shear is drilled and blasted prior to the production blasting tha t is done with sequential 15 m benches. This paper summarizes the monitorin g equipment and data gathered to date.